/ project record /

Bob Hawke College

Theatre & EducationAudiovisualConsultingTheatre
Bob Hawke College

Bob Hawke College’s performing arts spaces were planned the right way round: theatre first, technology in service of teaching. Our theatre team worked alongside HASSELL Architects from the planning stage, shaping spaces to the Secondary School Planning Guide while we designed the systems within them.

Decided on the drawings

Sightlines, focus and operability were decided on the drawings, not discovered on site. That is what theatre planning means in a school context: the room’s geometry, its rigging and its control positions all agreed before the first slab, so the technology never fights the architecture.

Designed for teaching staff

What we documented was an integrated theatre and performing-arts technology package with touchscreen control aimed at teaching staff - accessible enough for a Year 8 drama class, capable enough for opening night.

Scope

Theatre consulting and audiovisual design: the planning, systems design and documentation for the integrated theatre systems and touchscreen control. We held the consulting role here, as at Perth Modern School’s auditorium, and others priced and built the work.

Image: Bob Hawke College Stage 2 · HASSELL · photography by Peter Bennetts.

The disciplines behind this project Venue and theatre technology → Consulting and design →